NX-series IE5 motors
Built to run for decades
Electric motors and drive systems for pumps, compressors, fans and propulsion, from 0.75 kW to 5 MW.
- Cast-iron frame IP66 housing with deep cooling fins for sand, salt air and 50 °C summers.
- IE5 efficiency Permanent-magnet rotor cuts energy use by up to 30%.
- Tested before it ships Every motor runs a full load test in our Jebel Ali test bay.
Key figures
- Founded in Jebel Ali
- 1986
- countries served
- 24
- motors in service
- 120,000
- breakdown line
- 24/7
What we build
- Motors IE4 induction and IE5 permanent-magnet motors, low and medium voltage, in cast-iron and steel frames.
- Gearboxes Helical, bevel-helical and planetary gearboxes, designed with the motor as one drive unit.
- Drive systems Variable speed drives, motor control centres and complete skids, tested together before delivery.
- Service and repair Rewinds, refurbishment and 24/7 breakdown cover from seven service centres.
Recent projects
Measured after handover, not promised before it.
All projectsIndustries we serve
Certified, tested, safe
All three factories are certified to the same quality, environmental and safety standards, audited every year.
-
ISO 9001
Quality management
-
ISO 14001
Environmental management
-
ISO 45001
Occupational health and safety
-
ATEX
Motors for explosive atmospheres
-
IECEx
International hazardous area certification
-
DNV
Marine type approval for propulsion motors
-
ECAS
UAE conformity for motors (demo)
-
SASO
Saudi product conformity (demo)
1,412
days without a lost-time injury across our factories
News from the works
All news-
Our Jebel Ali test bay now runs complete drive trains at 6 MW
A new load machine and supply upgrade mean motors, gearboxes and drives up to 6 MW can be tested together before they ship.
-
Twenty-two trainees start at Jebel Ali
Our largest intake yet: electrical, mechanical and winding trainees, all starting in our rebuilt training workshop.
-
IE4 or IE5: which motor pays back faster?
The most efficient motor isn’t always the best buy. How we decide, with worked numbers for a 250 kW pump.
Need a motor sized for a job?
Send us the duty and the load. An application engineer replies within one working day.